SP SD45 page: Locomotives with "Elephant Ears"

About twelve SP SD45's were equipped with air-intake shrouds on the rear of the units to test the tunnel motor concept. The shrouds were all removed around 1974 following the delivery of the SD45T-2 "tunnel motors."

 

SP SD45's e/w Elephant Ears:

Applied by EMD (rounded shrouds):

SP 9001 SP 9069 SP 9105    

 

Applied by SP (angled shrouds):

SP 8827 SP 8834 SP 8912 SP 8937 SP 8984
SP 9013 SP 9044 SP 9088 SP 9110  

 

Back to Main Page